Photos can be included with the written repair plan
Repair priorities separated from optional updates
Temporary-protection availability confirmed case by case
Wind, hail, falling debris, and heavy rain can affect several exterior surfaces in the same event. A careful first review identifies visible damage, active water entry, and conditions that may need temporary protection before permanent work is scoped.
Ratcliff Rebuild Right LLC provides construction estimates for agreed repair work. Property owners remain responsible for coverage questions, claim requirements, and decisions made by their insurance carrier.
What to do after severe weather
Stay away from downed lines, unstable trees, and visibly unsafe building areas
Photograph accessible conditions without climbing onto the roof
Move belongings away from active interior water entry when it is safe to do so
Call or text with the property location and a short description of the damage
From visible damage to a repair plan
The walkthrough focuses on conditions that can be observed safely, including missing or displaced materials, impact areas, openings, and water entry signs. The estimate describes the construction work proposed based on those observations.
Concealed damage may not be visible until material is removed. When new conditions are found, Chris documents the issue and reviews the additional work before moving forward.
Temporary and permanent work
Temporary protection and permanent repair are different types of work. Temporary work may help keep out more water until a full repair can be made. Permanent work replaces or repairs the damaged materials listed in the estimate.
Availability after a large weather event can change quickly. Calling does not guarantee same-day service, so urgent life-safety or utility hazards should go to emergency services or the appropriate utility first.
Estimate Process
Review the work at the property
Call, text, email, or use the contact form with the property location and a concise description. The next step is based on visible conditions, access, the requested outcome, and current scheduling.